Nov. 10, 2005
Renovations to the Lobo Softball Field are coming along and some great additions to the new facility are currently in the works. Biggest project at Lobo Field that is currenty under construction is the indoor batting cage. The large brick building is connected to the Lobos' locker room for easy access on game and practice days. Images of the indoor cage and other facility renovations are just below.
 |
Lobo dugout with entrance that leads to the new softball building.

|
Inside of the locker room. Wooden lockers line all three sides of the room. Entrance to restroom facilities are screened by a wall of glass tiles.

|
Each player on the team has their own locker with their name engraved on a metal faceplate.

|
|
 |

|
New bathroom with showers, sinks and toilets.

|
Private shower stalls line the left side of the bathroom.

|
|
 |
Shower stalls also come with benches.

|
From the locker room, players can access the indoor batting cage.

|
West side view of the indoor batting cage.

|
|
 |
Just outside the indoor batting cage from the left field area and where a new bullpen will be constructed.

|
View of the entire facility from the warning track.

|
Visiting dugout along the first base line was also renovated to match the home dugout.

|
|
 |
|
|
New Mexico Lobos on Facebook